Lario Reti – Potabilizzatore Valmadrera

 

Completion of the second filtration line – line 2 – of the Valmadrera purification plant. Competition no. 6457833 – CIG 6734907D10.

  • Commissioned: LARIO RETI HOLDING S.p.A.

  • Year:

 

Cap Holding Sesto San Giovanni

 

Extraordinary maintenance of the gasometer at the Sesto San Giovanni sewage treatment plant – Prog. 5916 – Unique Project Code: 144H16000520005 – C.I.G. No .: 6848599AAC.

  • Commissined: CAP HOLDING S.p.A.

  • Year:

 

Comune di Napoli – Ponticelli

 

Executive design and construction of the wastewater recovery system from the buildings of the building lot L – housing in Naples-Ponticelli District 10 of the Zone Plan L. 167/62.

  • Commissioned: Comune di Napoli

  • Year: 2001

Read more

ABBANOA S.p.A.

 

Open procedure of 24/10/2007 for the design of the executive design and execution of the “construction of the power supply of the town of Alghero from the Coghinas to Truncu Reale. Adjustment of the water purification plant of Monte Agnese. ”

  • Commissioned: ABBANOA S.p.A.

  • Year: 2007

 

IANOMI Pero

 


Executive planning and turnkey realization of the second section – c.d. sludge line – and integrative works of the water line. for the completion of the existing Pero plant.

  • Commissioned: IANOMI S.p.A.

  • Year: 2005

 

Abbanoa Iglesias

 

Public enchantment, for the contracting of the works of “Risanamento del Rio Cixerri with the construction of the consortium purifier serving the municipalities of Iglesias, Museums, Villamassargia, Domusnovas and related purification plant. 1st lot. executive project purification plant “.

  • Commissioned: ABBANOA S.p.A.

  • ear: 2004

Read more

Campo pozzi e Potabilizzatore Teulada

 

Race n. 1/2012 relating to the works
  maintenance and management of water treatment, lifting and pressurization plants for the year 2012/2013 (period: 01/07/2012 – 30/06/2013). Location “Pisano” Barracks Teulada (CA). CIG No. 4070077DC.

  • Commissioned: 14ºREPARTO INFRASTRUTTURE

  • year: 2012

 

Potabilizzatore S.Vito

 

Service for one year of conduction, surveillance, control, routine maintenance of the San Vito drinking water treatment plant, located in the San Vito Municipality (CA), included in the interventions envisaged in the implementation and testing of an aging section for the adaptation of the process chain of San Vito drinking water plant – OP ERDF 2007/2013 Axis IV – Operational objective 4.1.5 – action line 4.1.5.b – Intervention to enhance the functionality of the supply system of the Basso Flumendosa system – Picocca (tender No. 68AS / 2012). CIG 4578719E6F – CUP I38D11000080006.

  • Commissioned: ENAS SPA

  • Year:

 

DEPURATORE DI TRAPANI

 

The purification plant of Trapani has a potential of 118,500 EQUIVALENT INHABITANTS, treats about 19-22,000 cubic meters of mixed waste per day.

Read more